Landfill Fees & Charges
Fees & Surcharges 2023/2024
All material is weighed at the Receiving Center
Per Ton | |
Minimum Charge | $15.00 |
Tree/Yard Waste | $40.00/ton |
Construction/Demo | $50.00/ton |
Landfill Disposal | $65.00/ton * |
Concrete/dirt/brick | $15.00/ton |
Surcharge | |
Tires smaller than 17 inches |
$10.00 ea |
Tires smaller than 17 inches with Rim | $20.00 ea |
Tires 18 to 24 inches | $15.00 ea |
Tires 18 to 24 inches with Rim | $30.00 ea |
Tires 25 inches or larger | $30.00 ea |
Tires 25 inches or larger with Rim | $75.00 ea |
Large appliances | $15.00 ea |
Special Waste | $130.00 ton |
Mattress & Box Spring Surcharge | $20.00 ea |
*Includes State disposal fee - $1.25